Site Reference: Mrecy University Hospital, Cork
Description: This hospital is over 150 years old and in 2005 (Phase 1) and 2007 (Phase 2) a new nurses education centre was built and a full refurbishment of the catering department was stated. The contract was to install one bed passenger lift and the removal of an old hydraulic kitchen Lift and replace with a new electric traction drive MRL to serve all floors. Both these projects were handed over to client on time and within the tender package price.
No. of Units: 2
Consultant: PH 1: VMRA Consasulting Engineers & PH 2: Mott McDonnell Pettit
Quantity Surveyors: Bruce Shaw Partnership
Architect: PH 1:Reddy O Riordan Staehli & PH 2: Keating & Associates Architects
Main Contractor: PH 1: John Sisk & Son Ltd & PH 2: John F Supple Ltd
No. of floors: 7
Lifts:
Capacity: 1 x 1375kg / 18 Person; 1 x 630kg / 8 Person; 1 x Removal of old existing Lift
Type: Kleemann Atlas Electric Traction Passenger Lift & Orona M33 Electric Traction MRL Passenger Lift
Drive: Gearless Electric traction MRL